Chiswick War Memorial Homes |
| Address: |
Burlington Lane, Chiswick
London, W4 3EU |
| Client: |
Sir Oswald Stoll Foundation |
| Architect: |
Living Architects |
| Engineers: |
Structural: Ellis & Moore Consulting Engineers
M+E: AJD Design Partnership |
| Employer’s Representative: |
Maddlin + Maddison |
| Contract Sum: |
£5.6m |
Description:
Chiswick War Memorial Homes is a two phase development consisting of the design and construction of 28no flats and a community centre, plus the refurbishment of 8no houses with extensive external works. The dwellings will provide accommodation for ex-service personnel with a range of disabilities.
The scheme is constructed in timber frame, with 10% of the energy requirement provided by renewable energy through the installation of solar panels. Level 3 of the Code for Sustainable Homes will be achieved by obtaining a 25% reduction in carbon emissions, using water saving devices, high levels of insulation, rainwater attenuation, using materials with a low u-value and achieving high levels of air tightness.
The first phase of the development completed in June 2009 with the second phase completed in July 2010.
|