monty_1.jpg
Chiswick War Memorial Homes
 web june 2010
Address: Burlington Lane, Chiswick
London, W4 3EU
Client: Sir Oswald Stoll Foundation
Architect: Living Architects
Engineers: Structural: Ellis & Moore Consulting Engineers
M+E: AJD Design Partnership
Employer’s Representative: Maddlin + Maddison
Contract Sum: £5.6m


Description:

Chiswick War Memorial Homes is a two phase development consisting of the design and construction of 28no flats and a community centre, plus the refurbishment of 8no houses with extensive external works. The dwellings will provide accommodation for ex-service personnel with a range of disabilities.

The scheme is constructed in timber frame, with 10% of the energy requirement provided by renewable energy through the installation of solar panels. Level 3 of the Code for Sustainable Homes will be achieved by obtaining a 25% reduction in carbon emissions, using water saving devices, high levels of insulation, rainwater attenuation, using materials with a low u-value and achieving high levels of air tightness.

The first phase of the development completed in June 2009 with the second phase completed in July 2010.


web 1 web 2 
 house front  house back
 
< Prev   Next >